Ongoing thought leadership — the team thinking out loud.
Shorter takes on interconnect trends, engineering perspective, and what we're seeing across AI infrastructure.

AEC for short reach and optics for distance is industry consensus. What is not settled is whether the link you installed has the margin to survive real load. At 800G and 1.6T, link choice becomes a validation problem.

Can copper keep up at 448G? Yes, but doubling the lane rate requires changes to signaling, error correction, and the electrical path. Moving connections closer to the silicon and choosing the right amount of signal conditioning will shape how far copper can reach—and at what power costs.
Plugfest 43 · CMIS 5.3 compliance and interop testingThis week, Infraeo is at the 43rd InfiniBand™ & RoCE Plugfest, one of the industry’s most rigorous multi-vendor validation environments for next-gen 800G and 1.6T connectivity.